Building calculators that use the numbers builders use
Metric, Australian products, and the waste allowances a site foreman would actually add. Every calculator shows its working and its assumptions, so you can check it before you order.
Measure from your plans
- Plan markup and takeoff
Open a PDF plan, set the scale and measure lengths, areas and counts. Send them to a calculator. Free, nothing uploaded.
Recently used
Concrete and footings
- Concrete slab
Cubic metres, 20kg bags, mesh sheets and edge beams.
- Concrete for post holes
Bags per hole for fence, deck and pergola posts.
- How much does a 20kg bag make?
Bags to cubic metres, and the point where premix wins.
- Footings
Strip and pad footing concrete, plus trench mesh.
- Concrete project planner
Every pour on the job, one total in m³, bags and premix.
- Columns and piers
Round or square, any number, bags per pier.
- Round slab and tank pad
Tank pads, round patios and fire pit rings.
Timber and decking
- Decking boards
Square metres to lineal metres, boards, screws and joists.
- Paling fence
Posts, rails, palings, nails and concrete.
- Stairs
Risers, going and run, checked against the NCC.
- Stud wall
Studs, plates, noggins and lintels at 450 or 600.
- Weatherboards and cladding
Lineal metres, boards and fixings from the cover width.
Roofing
- Colorbond roof sheets
Sheet count and length from the roof plan and pitch.
- Roof area and pitch
True area, rafter, ridge, hips, gutter and barge lengths.
- Roof tiles
Tiles, ridge caps, battens and sarking.
Outdoors and landscaping
- Retaining wall blocks
Blocks, caps, base and drainage for a block wall.
- Garden bed soil
Soil for raised beds in bags or bulk.
- Rainwater tank
Tank litres, roof harvest and days of supply.
- Pool volume
Litres, fill time, water cost and salt.
- Decking oil
Litres and tins for a deck.
Units and conversions
- Squares to m²
Roofing squares to square metres and back.
- m² to lineal metres
Area to board length from the cover width.
- Cubic metres to tonnes
Rock, sand, soil, mulch and concrete.
- mm, inches and feet
Every building length unit at once.
Bricks, blocks and walls
- Bricks
Bricks per square metre, pallets and mortar.
- Concrete blocks
Blocks per square metre and core fill.
- Sleeper retaining wall
Sleepers, posts, post length and concrete.
- Render
Bags of render by area and thickness.
- Paving
Pavers per square metre, bedding sand and road base.
Linings and finishes
- Plasterboard
Sheets by size, screws, compound and cornice.
- Paint
Litres and cans for a room, less doors and windows.
- Tiles
Tiles, boxes, adhesive and grout with waste.
- Insulation batts
Packs for walls and ceilings by pack coverage.
- Flooring
Packs or lineal metres, underlay and scotia.
Earthworks and landscaping
- Crushed rock, sand, soil and mulch
Cubic metres, tonnes and trailer loads.
- Excavation
Cut volume, bulking, tonnes, truck loads and machine time.
- Skip bins
Which bin size, and whether weight is the problem.
- Turf
Square metres, pallets, topsoil and fertiliser.
- Area of odd shapes
L-shapes, triangles, circles and trapezoids added up.
Renovation planning
- Renovation budget planner
Your quotes, a contingency and GST, added up properly.
- Renovation timeline
Weeks by stage, with start and finish dates.
- Kitchen benchtop
Square metres, slabs, joins and splashback.
- Bathroom waterproofing
Membrane litres, primer and bandage.
- Carpet
Broadloom metres off a 3.66 m roll.
- Skirting and architrave
Lineal metres and lengths to order.
- Downlights
How many, the spacing, and the watts check.
- Air conditioner size
Kilowatts for a room.
Cost guides
- Cost to build a house
Published per m² ranges for Victoria, by build level.
- Extension cost
Ground floor and second storey, per m².
- Bathroom renovation cost
Published ranges by level, and per m².
- Kitchen renovation cost
By level, plus benchtops by material.
- Concrete cost
Laid per m² by finish, and ready-mix per m³.
- Driveway cost
Concrete, asphalt, pavers and gravel per m².
- Deck cost
Installed per m² by material, with stairs and balustrade.
- Pergola cost
Open frame, roofed and louvred, per m².
- Carport cost
Single and double, kit or installed, with slab and permit.
- Retaining wall cost
Per m² of face by material, with drainage and engineering.
Home loans
- Mortgage repayment
Repayments on any loan, rate and term. Set to 25 years.
- Construction loan
Buy land and build: interest during the build, stage by stage.
- Extra repayments
Years and interest saved by paying more.
- LVR and deposit
Loan to value ratio and the 80 percent line.
- Loan comparison
Two rates side by side, with fees and the switching break-even.
- Renovation top-up loan
What borrowing more for a renovation adds and costs.
Tradie business
- Job quote builder
Labour, materials, subbies, overheads, margin, GST.
- True cost of an employee
What a worker costs per productive hour.
- Overhead recovery rate
What to add to every job for the business.
- Cash flow gap
The cash a trade business has to carry.
- Invoice due date
Terms to a date, days overdue, late interest.
- Retention
Held from each claim, the cap, and when it comes back.
Money and project
- Builder margin vs markup
Cost to price, and why 20% markup is 16.7% margin.
- GST
Add or remove 10% the right way.
- Progress payments
Victorian contract stages in dollars.
- Charge-out rate
The hourly rate a trade business has to charge.
About these calculators
Most quantity calculators online are built for the American market, in feet and yards, with product sizes that do not exist here. These are built around Australian products and metric measurements: 20 kg bags, 762 mm corrugated sheet cover, 230 × 110 × 76 mm bricks, 2400 × 1200 mm plasterboard, R2.5 batts at 430 mm centres. Each one states what it assumes, shows a worked example, and tells you what a builder would actually allow on top of the raw number.
They are quantity estimators, not structural design and not a quote. Always check the final order with your supplier and, for anything structural, with your engineer's drawings.